Troubleshooting and solution of opening device and weft insertion part Opening device:The cleaning cycle of the loom in use is 20-25 days each time, and the lithium grease filling cycle is 20-25 days each time, and ensure that the old oil can be extruded.the problem that often occurs in the opening
Trouble resolution of beating up shaft part and let-off part1. Beating up shaft partIt's easy to accumulate waste yarn at the waterproof shield od the swing shaft, causing damage to the bearing, which results in poor beating with abnormal noises and the machine stops cloth defects. Please refer to t
How to operate a air jet loom better and maintain the electric equipments of air jet loom1-How to operate air jet loom better? ① The original yarn is dry, the yarn defects are as few as possible, the original yarn strength is good, the strength is uneven is low, and the weak ring is less;② Electroni